Answers are grounded in this paper and cite their sources.
It is more important to obtain the sensitivity line, which is defined as a correlation between the ultra-high-frequency (UHF) signal (mV) and apparent charge (pC), for onsite calibration regarding partial discharge (PD). Synchronous measurement of the UHF method and IEC 60270 enables us to obtain the sensitivity line and to estimate the apparent charge in on-site substations. The sensitivity line of 3-phase gas-insulated switchgear (GIS) is compared to that of single-phase GIS, and differences in defects are also discussed. The fundamental data in this paper contribute to on-site insulation diagnosis of GIS
No takes yet. Share an insight, caveat, or question.
Hoshino et al. (2006) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: