Answers are grounded in this paper and cite their sources.
Characterizing excavation-induced stress disturbances is essential for ensuring the long-term stability of deep geological repositories (DGRs). To investigate stress disturbance during tunnel boring machine (TBM) excavation, a large-scale excavation disturbance test was conducted at the −280 m experimental level of the Beishan underground research laboratory (URL), China. Before excavation, a monitoring tunnel was constructed, and hollow inclusion strain sensors and Fiber Bragg Grating (FBG) strain sensors were installed in the surrounding rock mass to capture the dynamic strain response as the TBM advanced. To improve the accuracy of excavation-induced stress determination, a novel three-layer mechanical model was developed to describe stress transfer within the rock-cement-sensor system. The model provides an analytical solution for quantifying disturbed stresses by accounting for the distinct elastic properties of each layer, thereby reducing the systematic errors associated with conventional two-layer models. The results reveal tangential stress concentration in the roof and floor, radial stress unloading in the sidewalls, and the development of a high-deviatoric-stress zone ahead of the advancing tunnel face. Stress evolution during TBM excavation can be divided into four phases: the initial in-situ stress state, weak stress disturbance, strong stress disturbance, and stress equilibration. The maximum principal stress ( ) concentrated tangentially in the roof and floor, increasing by up to 10 MPa, whereas all three principal stresses decreased in the sidewalls because of radial unloading, accompanied by pronounced stress rotation near the excavation boundary. This study provides meaningful insights into the stress response mechanisms of rock masses subjected to TBM excavation.
No takes yet. Share an insight, caveat, or question.
Fan et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: