A smart distribution system should restore service to interrupted customers as quickly as possible after an outage. Upgrading manual switches to remote-controlled switches (RCSs) enhances restoration capability. The placement of RCSs should consider both functional and economic requirements. This paper presents a systematic method to determine the set of switches to be upgraded for an existing distribution system. The maximum restoration capability is achieved by upgrading a near-minimum number of manual switches to RCSs. The RCS placement problem is formulated as a weighed set cover (WSC) problem. A greedy algorithm with a polynomial-time computational efficiency is designed to generate a near-optimal solution for the WSC problem. A 3-feeder 9-node test system and a 4-feeder 1069-node unbalanced test system with microgrids are used to validate the effectiveness of the proposed method.
No takes yet. Share an insight, caveat, or question.
Xu et al. (2015) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: