We describe the construction and performance of a gas condensation cluster source. The source was designed for deposition of mass-selected metal clusters with controlled landing energy. We have produced clusters of Pbn (n=2–∼300) and Agn (n=∼20–∼300) with sufficient intensity to deposit size-selected clusters to a density of 1012 clusters/cm2 in 10 min. The landing energy of the clusters can be controlled from ∼25 to 800 eV.
No takes yet. Share an insight, caveat, or question.
Goldby et al. (1997) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: