Answers are grounded in this paper and cite their sources.
In this deliverable, the mass and energy balances of the benchmark cement plant without CO2 capture are presented. The balances have been derived from a VDZ model developed in previous projects and reproduced by Politecnico di Milano.
No takes yet. Share an insight, caveat, or question.
Campanari et al. (2016) studied this question.