Answers are grounded in this paper and cite their sources.
Production planning for open pit mines is a complex and significant problem that has been investigated by many researchers. The planning process usually starts with the construction of a geological block model, which comprises the set of imaginary regular blocks that covers the ore deposit and surrounding host rock. A set of attributes such as grade, specific gravity, and coordinate is then assigned to or estimated for each of these blocks using drill-hole sample data. Geological attributes are combined with technical and economic parameters in the next stage to determine the monetary value of each block and construct the economic block model, which provides the basic input for the production planning problem.
No takes yet. Share an insight, caveat, or question.
Asl et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: