This paper reports a real-life manufacturing case study in the short term production planning and control for a very large scale integrated (VLSI) circuit manufacturing production unit Dispatching in VLSI manufacturing is a crucial issue, since often binding constraints are set on the delivery dates by the customers downstream in the supply chain, while manufacturers , due to the huge fixed cost of capital goods, must ensure the full utilization of their shop floors. The complexity of the manufacturing technology and the re-entrant nature of the resulting production flows further add difficulties to the problem. Starting from a shop floor scheduling based on simple dispatching rules, e.g. FIFO rule, or the well-known 'minimum set-up' criterion, workcentres have been firstly grouped according to their nature, then they have been classified according to their criticality in terms of production capacity and flexibility. Finally, for each class, a customized, yet suitable to be implemented, dispatching rule is proposed and tested through a wide simulation campaign. Experimental results show that the proposed dispatching approach leads to a superior overall output and, at the same time, to an increased delivery timeliness.
No takes yet. Share an insight, caveat, or question.
Roberto Cigolini (1999) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: