The problem of short-term scheduling of multiproduct and multipurpose batch plants has received significant attention in the literature compared to the problem of short-term scheduling of continuous processes. In this paper, we present an improved model compared to the work of Ierapetritou and Floudas ( Ind. Eng. Chem. Res. 1998, 37, 4360) for short-term scheduling of continuous processes using unit-specific event-based continuous-time representation. The formulation is based on the state-task-network representation resulting in a mixed-integer linear programming model that accurately accounts for various storage requirements such as dedicated, finite, unlimited, and no intermediate storage policies. The formulation allows for unit-dependent variable processing rates, sequence-dependent changeovers, and with/without the option of bypassing of storage. Different variants of an industrial case study from a fast moving consumer goods manufacturing is presented to demonstrate the capability of the proposed model.
No takes yet. Share an insight, caveat, or question.
Shaik et al. (2007) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: