Answers are grounded in this paper and cite their sources.
The multi-manipulation system was developed that can precisely install a girder on a pier with four manipulators. By analyzing the working scenario and environment, the target specifications for each manipulator were derived. Based on the target specifications, link joint and structure were designed. The manipulator with a shape similar to the crane outrigger was designed and the working area of the manipulator was analyzed. The hydraulic system was designed for operation of the manipulator. Output force in the working area was analyzed and the output specifications of the hydraulic system were simulated. As a result, a multi-manipulation system that satisfies all the target specifications required for girder mounting work was developed.
No takes yet. Share an insight, caveat, or question.
Park et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: