Answers are grounded in this paper and cite their sources.
Practitioner's methodology for integrating AI in cost estimating and project controls in infrastructure projects, indicating a structured approach.
This article introduces the Fonseca Framework for AI-Assisted Cost Engineering (FACE), a five-stage practitioner methodology for structuring how artificial intelligence is adopted into cost estimating, scheduling, and project controls on large-scale infrastructure and mining projects. FACE is developed from field experience spanning a large-scale South American mining complex and smaller municipal civil works, and is built to sit inside the existing body of cost engineering practice — specifically as a complement to AACE International's Total Cost Management Framework — rather than to replace it. The framework is illustrated through two independently documented South American case studies of AI-driven generative scheduling, and its relevance to United States infrastructure delivery is examined against recent assessments from ASCE, McKinsey, the Federal Highway Administration, NIST, Autodesk, and Dodge Construction Network. The central argument is that the technology piece of this transition is largely solved; what the profession still lacks is a structured, accountability-first methodology for adopting it, and FACE is offered here as one practitioner's answer to that gap.
No takes yet. Share an insight, caveat, or question.
João Antônio Goulart Fonseca (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: