Answers are grounded in this paper and cite their sources.
The paper considers a scheme for increasing the efficiency of generating electricity at nuclear power plants based on the implementation of binary cycles. The energy and exergy analysis of the effectiveness of such cycles has been carried out. The main performance indicators are obtained. On the basis of exergy analysis the main sources of losses at nuclear power plants operating on a binary cycle have been obtained.
No takes yet. Share an insight, caveat, or question.
Sungatova et al. (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: