Time to build is a very important factor in a real estate development venture. Delay in completion of a project not only affects the financing costs and the rental revenue but also it may, on a more strategic note, determine the success or failure of a project. A time to build option model consisting of a stochastic rate of completion and a stochastic net project payoff is applied to the sequential construction process of a large scale construction project. The results of the sensitivity analysis show that the optimal payoff value, that triggers the exercise of the option to invest at a maximum rate, increases positively with the increases in cash flow volatility, input cost uncertainty, excess asset return per unit risk and maximum rate of investment. However, it has a negative relationship with the rental yield. In a case study involving a commercial project, the premium for hedging the payoff risks by pre-leasing a project was estimated at 11.29%, whereas the additional cost incurred for shielding a project against input cost risks in a design and build contract was estimated at 7.80%, where each is given as a percentage of the total construction costs.
No takes yet. Share an insight, caveat, or question.
Tien Foo Sing (2002) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: