The aim of this paper is to review postconstruction evaluation procedures, including audits for public‐works projects in Japan and postconstruction evaluations conducted by development aid agencies. By so doing, this paper advocates the need for new postconstruction evaluation systems and procedures. When civil engineering projects fail due to obvious technical errors or by natural disasters, the normal response is to investigate the causes of the failure in depth and to formalize methods to prevent such errors from repeating themselves. However, efforts are seldom made to identify the causes of a failure in cases where problems are likely attributable to changes in social and economic circumstances under which civil works were planned and implemented. As a result, it is not uncommon for similar mistakes to be repeated. Irrespective of the success or failure of a project, the information and knowledge gained from postconstruction evaluations can be a valuable resource for planning future projects, if the postconstruction evaluation procedures were well organized and properly conducted.
No takes yet. Share an insight, caveat, or question.
Yuzo Akatsuka (1994) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: