Photovoltaic generating units connected to distribution systems represent a type of distributed generation (DG) that has been experiencing increased growth in recent years. Higher DG penetration levels may be interesting from many different points of view, but raise important issues about distribution system operation. Therefore, new techniques are needed to determine the maximum amount of DG that may be installed without requiring major changes in the existing electric power system. According to the literature, voltage rises at load bus bars are a serious limiting factor when installing DG. This paper presents and discusses studies proving that conductor ampacity and voltage rises are limiting factors that manifest themselves under different conditions. The present study highlights situations in which line overloads are more restrictive than voltage rises. Variation in substation voltage, load, and its power factor were simulated in a simplified radial distribution system model, and the amount of distributed generation that may be installed was obtained. Mathematic formulae were developed to determine the amount of distributed generation for existing utility systems.
No takes yet. Share an insight, caveat, or question.
Shayani et al. (2010) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: