Answers are grounded in this paper and cite their sources.
This paper addresses a permutation flow-shop scheduling problem where there are a finite number of transporters to carry jobs from each machine to its subsequent machine. The problem is first formulated as a mixed-integer linear programme, and then two anarchic society optimisation (ASO) algorithms are developed to solve large-sized instances of the problem. The numerical experience shows that the ASO algorithms are considerably effective and efficient. Finally, a sensitivity analysis is carried out to study the performance of the manufacturing system versus the transportation times and the number of transporters.
No takes yet. Share an insight, caveat, or question.
Ahmadi‐Javid et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: