We consider a Markovian, failure prone, single machine, single part-type, fluid flow, manufacturing system. The failure rate depends on the production rate through a non decreasing, piecewise constant function which may assume two values. The problem is to minimize a long term average expected cost which penalizes both the presence of waiting customers and the inventory surplus. We derive and prove the optimality of a policy which depends on two thresholds. The expression of these thresholds and of the optimal cost is also included in this note together with some numerical examples.
No takes yet. Share an insight, caveat, or question.
Francesco Martinelli (2007) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: