Effective management of construction projects encounters significant challenges, particularly due to frequent impacts influenced by climatic variables. Anticipating weather-induced impacts is crucial, and while various methods such as stochastic generators, productivity impact models, and machine learning tools are employed to model such gap, there remains a notable gap. Specifically, there is a lack of direct approaches that utilize easily accessible historical meteorological data to model impacts. This paper proposes a flexible non-parametric model designed to estimate the probability distribution of construction project completion times by incorporating meteorological information. The proposed model enhances PERT-based approaches by incorporating climatic effects to improve delay distribution estimation. This enhancement involves the direct modeling of productivity, coupled with the use of Monte Carlo simulation. A commercial version of the algorithm presented is currently part of a solution utilized in over 70 projects across the UK. The results demonstrate the model’s utility in forecasting optimal start dates, estimating project completion times, establishing contractual limits for expected weather-related delays, and analyzing critical paths within the project. Additionally, a mathematically rigorous tool for model comparison is presented, allowing for hyperparameter optimization and the selection of the most suitable prediction model.
No takes yet. Share an insight, caveat, or question.
Comito et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: