Automated process planning has been recognized as an interface between computer-aideddesignand computer-aided manufacturing. To achieve true computer integrated manufacturing (Cllvl), process planning should be integrated with scheduling. One approach to this integration problem is to merge process planning and scheduling into a single optimization task. However, the scheduling problemalone belongs to the classof nondeterministic polynomial complete (NP-complete) problemsand whencombined with processplanning, the resulting problemis evenmore difficult. One solution to this is to adopt a progressive approach, in which the interaction between process planning and scheduling starts from a more global level and ends at a more detailed level. The progressive approach described in thispaper greatlyreduces the computational complexity of the integration problemand hence can be realized in a real manufacturing environment where time is critical.
No takes yet. Share an insight, caveat, or question.
Huang et al. (1995) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: