Answers are grounded in this paper and cite their sources.
The Pearl Harbor case study reveals that risk analysis failure may be caused by any of a number of factors. However, the most important variables are system load, gain, lead time, and lag time. The dynamics of such cybernetic systems analysis constitute an important aspect in this regard. Four different risk management strategies, or organization designs, have been proposed in this paper. Each has a unique combination of the imputed variables and each has a unique cause of surprise, risk analysis failure, and crisis.
No takes yet. Share an insight, caveat, or question.
Kevin J. Foster (1997) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: