Answers are grounded in this paper and cite their sources.
A computational scheme that is able to determine at each stage the most economical generation decision for each plant of a hydrothermal system is presented. The algorithm is based on the stochastic extension of Benders decomposition and can be implemented from already existing operation models. The results can be used in the weekly or monthly generation scheduling activities in real‐time operation. A case study with 37 reservoirs of the Brazilian system is presented and discussed.
No takes yet. Share an insight, caveat, or question.
Pereira et al. (1985) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: