This is the authors' abstract. We don't add key points for this paper.
This study delves into the optimization of PID control parameters for Multi-model Adaptive High-speed Rail Platform Door Control Systems (MMAHSR-PDCS) using the Individual-Based Model Dynamic Multi-Swarm Snow Goose Algorithm (IBM-Dy-SGA). The IBM-Dy-SGA effectively balances exploration and exploitation through a dynamic multi-swarm mechanism, combined with Latin Hypercube Sampling (LHS) initialization and K-means clustering strategies, thereby enhancing population diversity and convergence efficiency. Experimental validation demonstrates that, compared to the Snow Goose Algorithm (SGA), the IBM-Dy-SGA achieves a 10%–30% reduction in average fitness values and a 20% improvement in convergence speed. The IBM-Dy-SGA was further compared with seven other state-of-the-art algorithms on the CEC2017 benchmark test suite in both 10D and 30D, showcasing its significant advantages and validating these results through non-parametric tests. In the context of application for the control of MMAHSR-IPDCS, the IBM-Dy-SGA outperforms traditional methods in optimizing PID parameters, thereby significantly enhancing the precision and stability of platform door control systems. Specifically, the IBM-Dy-SGA reduces overshoot to 0% and shortens the settling time to 1.05 s, representing a 66.7% improvement over traditional methods. The practical application of the IBM-Dy-SGA at Zigong Station successfully resolved platform door alignment issues under varying train models and parking error conditions, demonstrating its effectiveness and reliability in complex and dynamic high-speed rail operations. For instance, in tests involving CRH380A, CRH380AL, CRH380AN, and CRH380D train models, the alignment rate of platform doors with train doors reached 100%, while for the CRH3A model, the alignment rate was 94.36%. This study not only enriches the theoretical application of metaheuristic algorithms in control systems but also provides a practical optimization method for high-speed rail platform door control, which is of great significance for enhancing the safety, efficiency, and reliability of high-speed rail operations.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Zhan et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: