Answers are grounded in this paper and cite their sources.
A technique is developed for maximizing the financial feasibility of a complex, multiple river water resources system for planning purposes, based on deliveries of firm power, in‐season water, dump power, and off‐season water, with flood control and releases for noncommensurate objectives as parameters. This method is an important modification of a previously reported analysis involving dynamic programing, linear programing, and modified gradient procedure, replacing the computationally inefficient linear programing determination of the shadow prices by a standard sequence of constraints. Total computation time is reduced from hours to minutes.
No takes yet. Share an insight, caveat, or question.
Hall et al. (1969) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: