Answers are grounded in this paper and cite their sources.
It is common for ground motions to be estimated using a combination of probabilistic and deterministic procedures. Probabilistic seismic hazard analyses (PSHA) are performed to estimate intensity measures ( IMs ) for reference site conditions (usually rock). This is followed by a deterministic modification of the rock IMs to account for site effects, typically using site factors from the literature or seismic codes. We demonstrate for two California sites and three site conditions that the deterministic application of nonlinear site factors underestimates ground motions evaluated probabilistically for return periods of engineering interest. Reasons for this misfit include different standard deviation terms for rock and soil sites, different controlling earthquakes, and overestimation of the nonlinear component of the site response in the deterministic procedure. This problem is solved using site‐specific PSHA with appropriate consideration of nonlinear site response, within the hazard integral.
No takes yet. Share an insight, caveat, or question.
Goulet et al. (2009) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: