Answers are grounded in this paper and cite their sources.
We address multi-item inventory systems with random and seasonally fluctuating, and possibly correlated, demands. The items are produced in two stages, each with its own lead-time; in the first stage a common intermediate product is manufactured. The production volumes in the first stage are bounded by given capacity limits. We develop an accurate lower bound and close-to-optimal heuristic strategies of simple structure. The gap between them, evaluated in an extensive numerical study, is on average only 0.45%. We use the model to investigate the benefits of various delayed product differentiation (postponement) strategies, as well as other strategic questions, including (i) the benefits of flexible versus dedicated production facilities; (ii) the trade-off between capacity and inventory investments; and (iii) the trade-off between capacity investments and service levels.
No takes yet. Share an insight, caveat, or question.
Aviv et al. (2001) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: