Answers are grounded in this paper and cite their sources.
A bicriterion problem of scheduling jobs on a single machine is studied. The processing time of each job is a linear decreasing function of the amount of a common discrete resource allocated to the job. A solution is specified by a sequence of the jobs and a resource allocation. The quality of a solution is measured by two criteria, F1 and F2. The first criterion is the maximal or total (weighted) resource consumption, and the second criterion is a regular scheduling criterion depending on the job completion times. Both criteria have to be minimized. General schemes for the construction of the Pareto set and the Pareto set ε-approximation are presented. Computational complexities of problems to minimize F1 subject to F_2≤ K$ and to minimize F2 subject to $F_1≤ K$, where K is any number, are studied for various functions F1 and F2. Algorithms for solving these problems and for the construction of the Pareto set and the Pareto set $ε$-approximation for the corresponding bicriterion problems are presented.
No takes yet. Share an insight, caveat, or question.
Cheng et al. (1998) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: