The development of a unique three phase load flow algorithm is presented which employs a hybrid (implicit Z-BUS and Y-BUS Gauss) iterative technique without making any non-practical assumptions about the generators. The main applications of this three phase load flow program will be to find optimum line configuration when a utility wants to construct a new transmission line, to find the optimum transposition positions and line arrangements through a system, and for estimation of generator current unbalance during normal operation.
No takes yet. Share an insight, caveat, or question.
Chen et al. (1990) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: