Answers are grounded in this paper and cite their sources.
The Sydney Metro Northwest involves construction of a fully automated metro rail network in New South Wales, Australia. The underground stations are delivered under two contracts: the Tunnels and Station Civils contract, responsible for the excavation and temporary support, and the Operations, Trains and Systems contract, responsible for the station structures. At the Castle Hill station, the excavation intersects a regional Dural Dome fault, resulting in a rock wedge measuring approximately 20 m high by 80 m long being exposed during excavation. Due to the limited design life of the temporary support, the ground pressure will ultimately be transferred to the station walls. Capturing this, as well as the beneficial effects of the stress relaxation due to the initial excavation, is crucial in achieving an optimised design. This paper presents the integrated ground–structure interaction approach adopted for the permanent walls’ design, which resulted in optimised design ground pressures and station wall thicknesses.
No takes yet. Share an insight, caveat, or question.
Hsi et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: