Answers are grounded in this paper and cite their sources.
In construction projects, risks are inevitable and may arise dynamically throughout the project lifecycle. This study proposes a novel risk identification framework for engineering projects based on Digital Twin (DT) technology, integrating static and dynamic methods to combine objective data analysis with expert judgment. By leveraging DT’s real-time monitoring and proactive capabilities, the framework enhances risk visualization and supports informed decision-making in complex project environments. Its effectiveness was validated through a case study covering construction and operation phases, with results confirmed by on-site personnel. SWOT and comparative analyses with existing methods highlight the framework’s strengths and improvements in risk identification accuracy and decision-making support. The framework improves traditional risk management by leveraging DT for real-time monitoring, visualization, and enhanced decision-making in complex engineering projects, which provides a novel solution for risk identification.
No takes yet. Share an insight, caveat, or question.
Pan et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: