Answers are grounded in this paper and cite their sources.
Industrial sector consumes a substantial portion of electrical energy. Building owners persistently believe that combining on-site renewable energy systems to buildings is not cost-effective in Sri Lanka. Therefore, this research aimed to evaluate the use of on-site renewable energy sources for industrial buildings in Sri Lanka. This research carried out 10 expert interviews and 6 case studies. Experts determined that solar and biomass as viable on-site energy generating sources in Sri Lanka. Life-cycle cost was calculated for six case studies representing three case studies for each viable option followed by a sensitivity analysis. Based on the research findings, biomass can effectively manage waste while eliminating the risk of the emission of harmful biomethane. Based on the calculations, the payback period for a solar system varies between 4 and 6 years and biomass system varies between 6 and 7 years. This research explored the potential of generating on-site renewable energy for industrial building. Although the ‘on-site’ energy generation is not widely discussed in industrial buildings, this research study strengthened the possibility of adopting solar and biomass as on-site renewable energy generation sources.
No takes yet. Share an insight, caveat, or question.
Nanayakkara et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: