Answers are grounded in this paper and cite their sources.
Risk identification is an important thing which is the initial identification of risk management. Change Order which causes the cost of contract items to swell, planning errors and omissions as well as changes in scope that can be reduced by sharpening the planning results. This research focuses on identifying risks for change orders for road construction projects in the West Java province. Actual data obtained from 10 road construction projects from the 2013 fiscal year to the 2018 fiscal year to get the frequency of change orders that occur in various road construction work and the results obtained are to produce 313 construction changes with the identification of change order risks in 21 road construction projects with the largest change order risk identification on the work Asphalt Emulsion Absorb Layer, Type 2 Precast Kerb, Masonry with mortar, Low strength concrete f'c 15 MPa, Masonry followed by 16 other construction works.
No takes yet. Share an insight, caveat, or question.
Waty et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: