Answers are grounded in this paper and cite their sources.
This paper considers three models with imperfect preventive maintenance (pm), viz the unit after pm is not always like new; i) the unit is repaired upon failure, ii) the unit undergoes minimal repair at failure, and iii) the failed unit is detected only by perfect pm. Optimum preventive maintenance policies minimizing the s-expected cost rate for each model are discussed.
No takes yet. Share an insight, caveat, or question.
Toshio Nakagawa (1979) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: