Answers are grounded in this paper and cite their sources.
This study presents the results of technical and economic analysis of high‐voltage direct current (HVDC) transmission system and high‐voltage alternating current transmission system for bulk transmission over very long distances. The last is a point‐to‐point transmission that does not need reactive compensation and does not have intermediate substations, the half‐wavelength transmission (HWL). Special attention is paid to reliability and ways to meet the N − 1 criteria regarding security and adequacy. Single‐circuit lines instead of double‐circuit ones are considered for economic and environmental reasons ensuring the same reliability when clearing the most frequent line‐to‐ground (or single‐pole) fault. For this, single‐circuit line with reserve phase for HWL and quadripolar single‐circuit line for HVDC are proposed. The analysed system considered Brazilian electrical system conditions: 6000 MW transmission over 2500 km. This study highlights the advantages of applying a reserve phase for HWLs and a third converter substation increase to cope with system security with minimum cost. It is shown that the single‐circuit HWL with reserve phase has an investment 30% lower than that for HVDC, resulting in a total yearly cost 15% lower.
No takes yet. Share an insight, caveat, or question.
Samorodov et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: