Answers are grounded in this paper and cite their sources.
This paper presents multi-step forward forecasting studies using real-time generated electrical power time series. Nonlinear Automatic Regression (NAR) and Autoregressive Integrated Moving Average (ARIMA) models were created and applied to the generator power time series produced in Afşin-Elbistan Thermal B Plant. The data were divided into three categories as raw, 10-moving average and 20-moving average while the number of forwarding steps has been established as 6-step forward, 12-step forward and 20-step forward. Performance results of NAR and ARIMA models were presented with 6 scenarios, and then, the results were compared with tables and graphs. As a result of all studies, it has been observed that the model’s success was greatly affected by moving average and forward steps parameters.
No takes yet. Share an insight, caveat, or question.
Kerem et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: