Answers are grounded in this paper and cite their sources.
Suspended sediment production after road construction, logging, and slash disposal was significantly increased ( P = 0.95) on two watersheds in Oregon's Coast Range. A 25% patch‐cut watershed showed increases during 3 of 8 posttreatment years. These increases were caused primarily by mass soil erosion from roads. Monthly sediment concentrations before the occurrence of the annual peak flow were increased more than those following the annual peak. Surface erosion from a severe slash burn was the primary cause of increased sediment yields for 5 posttreatment years on a watershed that was 82% clear‐cut. Monthly sediment concentrations were generally increased throughout the winter runoff period on this watershed. The flushing of suspended sediment in Oregon Coast Range watersheds is apparent from seasonal changes of suspended sediment rating curves.
No takes yet. Share an insight, caveat, or question.
Robert L. Beschta (1978) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: