Answers are grounded in this paper and cite their sources.
This paper describes an industrial scheduling problem taken from a cable manufacturing process. An heuristic solution procedure known as the CMD rule is presented for this multi-product, multistage, continuous flow problem. The solution procedure is designed to minimize the sum of idle time of machines and in-process waiting at the second stage. A comparison of this rule with some standard scheduling rules is provided.
No takes yet. Share an insight, caveat, or question.
NARASTMHAN et al. (1984) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: