Answers are grounded in this paper and cite their sources.
Truck haulage reliant operations generally experience higher operating costs due to longer haulage distances. With growing attention on the environmental impacts of mining, particularly greenhouse gas emissions, alternatives like Fully Mobile In-Pit Crusher Conveyor (FMIPCC) systems are being explored. In this system, the crusher is fed directly by a digging unit at the working face, with material then transported via a conveyor belt network. However, FMIPCC’s reduced flexibility requires advanced strategic planning, for which no commercial tools are currently available. This research develops a mixed-integer programming model to optimise FMIPCC planning, integrating key constraints and maximising Net Present Value (NPV).
No takes yet. Share an insight, caveat, or question.
Cheng et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: