Several utilities have found partial discharge testing to be very useful for identifying motors or generators with deteriorated stator winding insulation. Such partial discharge tests are sensitive to problems associated with overheated insulation, loose stator bars, and pollution, all of which can cause in-service failures with long associated outages and high repair/rewind costs. Unfortunately, the partial discharge test is not widely applied since present test methods require considerable skill to perform, and/or require machine outages. These problems are due to the stator winding partial discharges being masked by high levels of internal and external electrical noise. The authors describe how partial discharge tests have now been developed which eliminate the effect of noise, thus allowing plant personnel to perform the test without any machine outage.>
No takes yet. Share an insight, caveat, or question.
Campbell et al. (1994) studied this question.