Answers are grounded in this paper and cite their sources.
Analysis of the job shop scheduling domain has indicated that the crux of the scheduling problem is the determination and satisfaction of a large variety of constraints. Schedules are influenced by such diverse and conflicting factors as due date requirements, cost restrictions, production levels, machine capabilities and substitutability, alternative production processes, order characteristics, resource requirements, and resource availability. This paper describes ISIS, a scheduling system capable of incorporating all relevant constraints in the construction of job shop schedules. We examine both the representation of constraints within ISIS, and the manner in which these constraints are used in conducting a constraint‐directed search for an acceptable schedule. The important issues relating to the relaxation of constraints are addressed. Finally, the interactive scheduling facilities provided by ISIS are considered.
No takes yet. Share an insight, caveat, or question.
Fox et al. (1984) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: