Answers are grounded in this paper and cite their sources.
This article addresses the efficient coordination of multiple electrical drill rigs in open-pit mines, considering unique constraints such as continuous power supply, dynamic obstacle creation, and safe distancing. The objective is to maximise drilling within a given time horizon. This paper provides a comprehensive problem description and proposes a constraint programming model complemented by a heuristic algorithm. Experimental results demonstrate the model’s effectiveness in scheduling up to 300 tasks with 3 machines over 24 hours, achieving near-optimal solutions within 2 minutes. For instances with fewer than 250 tasks, the model consistently reaches optimal solutions, enabling real-time decision-making in dynamic mining environments.
No takes yet. Share an insight, caveat, or question.
Maftah et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: