Answers are grounded in this paper and cite their sources.
The Flexible Job Planning (FJSP) problem is another planning and scheduling problem. It is a continuation of the classic problem of scheduling jobs, where each operation can be performed on different machines, while the processing time depends on the machine being used. FJSP is a difficult NP problem that consists of two sub-problems, scheduling problems and scheduling operations. The paper presents a model for solving FJSP based on meta-heuristic algorithms: Genetic algorithm (GA), Tabu search (TS) and Ant colony optimization (ACO). The efficiency of the approach in solving the aforementioned problem is reflected in the flexible search of space and the choice of dominant solutions. The results of the computation are graphically represented on the Gantt chart.
No takes yet. Share an insight, caveat, or question.
Stanković et al. (2020) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: