This research presents a strategy and information system to manage the logistics and progress control of structural steel works under the integrated environment of radio frequency identification and four-dimensional computer-aided design (4D CAD). Considering the characteristics of the manufacturing and erection processes of structural steel works in high-rise building construction from a practical point of view, this research has developed a strategy to support successful application of these two state-of-the-art technologies and has developed an information system to support the logistics and progress management based on this strategy. The results of this research have been validated and verified through real-world applications in two high-rise building construction projects considering realistic constraints. Time study has been conducted to verify the efficiency of the proposed information system. In addition, lessons learned and issues identified through these real-world applications are described and discussed in this paper.
No takes yet. Share an insight, caveat, or question.
Chin et al. (2008) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: