Answers are grounded in this paper and cite their sources.
The authors discuss the application of expert systems programming techniques to the design of lead-lag compensators for a linear, single-input/single-output, continuous-time plant. A design method based on first adjusting the high-frequency response with lead and constant-gain compensators followed by adjusting the low-frequency response with lag compensators has been developed. This design heuristic is presented and its ability to achieve specifications for a range of different plants is discussed. The heuristic has been implemented using the production rule knowledge representation; examples of production rules are given and their use is discussed. Inference-engine capabilities and extensions to a conventional analysis and design package, required to implement this automatic control system design method, are also outlined.
No takes yet. Share an insight, caveat, or question.
James et al. (1987) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: