Answers are grounded in this paper and cite their sources.
This work presents a decentralized implementation of the DC Optimal Power Flow (OPF) problem on a network of workstations. Each workstation is assigned to a regional Transmission System Operator (TSO), who manages the operation of the transmission system of his own region, as well as cross-border exchanges with neighboring regions. The workstations take part in an iterative process, exchanging information with each other and solving regional OPF sub-problems, until the global OPF solution is reached. Tie-line related information is exchanged between workstations assigned to neighboring regions. A master workstation, assigned to a "Super-TSO", checks for the convergence of the algorithm. The parallel processing system is tested on various test systems, including a large real-world system, the Balkan power system.
No takes yet. Share an insight, caveat, or question.
Biskas et al. (2005) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: