Answers are grounded in this paper and cite their sources.
Quality control in sampling has been demonstrated as practicable in sampling procedures that require the combination of sample increments to form a composite sample. The proposed method requires no sampling resources or use of time beyond those normally used. Increments are allocated at random into two half-sized composites, each of which is analysed separately. The absolute difference between the two results is plotted on a one-sided control chart, which is interpreted like a Shewhart chart. In commonly prevailing circumstances the analytical precision is negligible and the chart represents sampling precision alone.
No takes yet. Share an insight, caveat, or question.
Thompson et al. (2001) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: