Answers are grounded in this paper and cite their sources.
Due to the growing interest in integrated continuous processing in the biopharmaceutical industry, productivity comparison of batch-based and continuous processes is considered a challenge. Integrated continuous manufacturing of biopharmaceuticals requires scientists and engineers to collaborate effectively. Differing definitions, for example, of volumetric productivity, may cause confusion in this interdisciplinary field. Therefore, the aim of this communication is to reiterate the standard definitions and their underlying assumptions. Applying them to an exemplary model scenario allows to demonstrate the differences and to develop recommendations for the comparison of productivity of different upstream processes.
No takes yet. Share an insight, caveat, or question.
Bausch et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: