Answers are grounded in this paper and cite their sources.
This paper presents a methodology to design an optimal bidding strategy for a generator according to his or her degree of risk aversion. A typical thermal plant is assumed to be located in the Ontario electricity system to apply this methodology for two types of participants: risk averse and risk seeker.
No takes yet. Share an insight, caveat, or question.
Rodriguez et al. (2004) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: