Answers are grounded in this paper and cite their sources.
The study evaluated the logistics performance of Nigerian ports in the post privatization regime. The objectives of the study was among other things, to investigate the existence of delay in ship husbandry operations and processing of shipping trade in Nigeria seaports; The study used export facto research design, employing secondary data sourced from the Nigeria ports Authority, The Nigeria Shippers Council, The World Bank, the United Nations Conference on Trade and Commerce and the Central Bank of Nigeria. The Net Output Model approach for estimating value of time lost, the paired sample-test and the log-linear multiple regression analysis methods were used to analyze the data obtained. It was found that, there exist disproportionate levels of delay in ship husbandry operations in the individual seaports of Nigeria such that, in each for Onne, Lagos Apapa, Warri, Rivers and Calabar ports, the delays encountered by ship operators in ship husbandry operations is 1.878 days, 5.34 days, 3.47 days, 2.81 days and 2.44 days respectively. The Nigeria port sector average delay in ship husbandry operations is 9.2days. The result of the study also indicate the existence of 9.0days, 16.73days, 14.1days, 15.6days, and 13.4days delays in the processing of shipping trade in each of Onne, Lagos Apapa, Warri, Rivers and Calabar ports respectively. It was recommended that port authorities and terminal operators in collaboration with the Nigeria Shippers Council should develop delay reduction policies and strategies in ports in order to ensure that trade processing and ship operations time in Nigeria ports comply with global benchmark.
No takes yet. Share an insight, caveat, or question.
Mbachu et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: