Answers are grounded in this paper and cite their sources.
This paper presents a new decoupled model together with a very efficient coordination algorithm to solve a hydrothermal optimal power flow (HTOPF) problem over a certain time horizon. Based on the Lagrange relaxation at the level of the KKT (Karush-Kuhn-Tucker) conditions of the primal problem, the HTOPF is decomposed into thermal plant subproblems formulated as OPF and hydroplant subproblems. To solve efficiently the thermal OPF subproblems, the warm-starting scheme has been incorporated into interior point quadratic programming (IPQP). As to the hydroplant subproblems, a united network flow model is presented in which a fixed head plant is treated as a special case of a variable head plant. The hydroplant subproblem can be formulated as a minimum-cost maximum-flow problem for which unit cost functions of hydroplants are defined exactly. A proposed variant of the partitioning shortest path algorithm has brought about a great speed up in the computation of the subproblems. The validity of the proposed method has been examined by solving the IEEE test systems and a Chinese power system consisting of 13 thermal plants and 12 hydro power plants; the last system is a large size problem such that it has 107712 primal and dual variables. Simulation results obtained are quite convincing.
No takes yet. Share an insight, caveat, or question.
Wei et al. (1998) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: