Answers are grounded in this paper and cite their sources.
Installation of hydroelectric power at Brighton Dam on the Patuxent River (near Olney, Maryland) in December 1985 was accompanied by a revised (versus preoperational) flow release schedule intended to reduce the amount of time downstream macroinvertebrates were exposed to extreme high and low flows and to eliminate rapid changes in flow between these extremes. To assess whether the flow regime was effective at protecting downstream biota, benthic macroinvertebrate populations were monitored for 20 months before and 23 months after the revised flow regime was implemented. Changes in invertebrate abundance below the dam were tested using an analysis of covariance, employing abundance above the dam as a covariate to account for seasonal and among-year variation. The revised flow regime resulted in a 35% reduction in low flows (defined as flows less than half the average annual flow) and a 25% reduction in high flows (defined as greater than twice the average annual flow). Benthic macroinvertebrates responded to this improvement in the flow pattern with a doubling in total density at the downstream sites. The altered flow regime also resulted in increased abundance at below dam stations for six of the 11 taxa that were analyzed individually as well as a higher quality invertebrate community at the downstream station nearest the dam (measured by the Hilsenhoff index). Careful planning of flow modification associated with hydroelectric operations was effective not only at protecting, but also enhancing the downstream biota.
No takes yet. Share an insight, caveat, or question.
Morgan et al. (1991) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: