Answers are grounded in this paper and cite their sources.
This is a tutorial on general techniques for combinatorial approximation. In addition to covering known techniques, a new one is presented. These techniques generate fully polynomial time approximation schemes for a large number of NP-complete problems. Some of the problems they apply to are: 0-1 knapsack, integer knapsack, job sequencing with deadlines, minimizing weighted mean flow times, and optimal SPT schedules. We also present experimental results for the job sequencing with deadlines problem.
No takes yet. Share an insight, caveat, or question.
Sartaj Sahni (1977) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: